查看: 672|回复: 0

[综合] 重新设计的市政厅

[复制链接]

61

粉丝

103

关注

271

主题

三级屋友

PGB
2951 个
发表于 2013-10-11 22:06:02 | 显示全部楼层 |阅读模式

这是由Henning Larsen设计的瑞典基律纳市政大厅,该城市旧的市政大厅由于采矿引起的地面下陷而被损毁。采矿活动已经计划了将近十年, 国家矿业公司在2004年警告说, 该市官员如果继续挖掘更多的铁矿石,将会破坏基律纳的城市地面,可能会产生人为的地震。这个建筑建成后,约有2500套公寓,共200000平方米的店铺、办公室、学校和医疗建筑。该项目预计将在未来20年内在旧址东两英里处重建。建筑师Henning Larsen凭借一个圆形建筑与晶体形状结合的设计方案赢得了该项目的设计权。他独具匠心的晶状体结构设计可以制造储存大量铁矿石的空间。该地区在上世纪五十年代被政府收回,那时包括一个原始的钟鼓楼和一个公共广场在内,都被夷为平地。建筑师Henning Larsen的圆形设计是为了尽可能多地使光线进入室内,并将在周边设有办事处和公共中心。“基律纳的新市政厅是一个民主建筑,将对所有市民开放。”该市市长说。该项目计划于2016年完工。



Danish firm Henning Larsen Architects has won a competition to design the replacement city halfor a Swedish city that's set to be relocated after mining caused huge underground cracks in the area.The move has been planned for nearly a decade, after the state mining company warned city officials in 2004 that excavating more iron ore would destabilise the ground beneath the city of Kiruna, northern Sweden.Around 2500 flats and a total of 200,000 square metres of shops, offices, schools and healthcare buildings will be rebuilt over the next 20 years on a new site two miles east, and the city hall is the first public building to be affected.Henning Larsen Architects' competition-winning proposal features a circular building with a crystal-shaped inner structure that is intended to resemble iron ore deposits.Parts of the 1950s hall will be recycled where possible, including an original bell tower that will be reinstalled in the public square surrounding the new building.The circular plan is designed to bring as much light as possible into the interior spaces, which will be arranged with offices around the perimeter and public facilities in the centre."Kiruna's new city hall is a democratic building, open to everybody," said studio director Peer T. Completion is scheduled for 2016.
来自筑龙网
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

关注公众号

相关侵权、举报、投诉及建议等,请发 E-mail:pgive@qq.com

Powered by Discuz! X5.0 © 2001-2026 Discuz! Team.|蜀ICP备12029808号|川公网安备51010702000609号

在本版发帖
关注公众号
返回顶部